Southern Oxide Pit, Crushing Circuit and Stockpile Area
|
Vat 1, the first production vat (Vats 1a and Vat1c were primarily commissioning vats) is now complete and will be filled in a week or so. The people give an idea of scale with Vat 1 being much larger than the previous vats.
High grade ore as defined by the recent drilling has been drilled and blasted and is now being mined and crushed.
|
Laying plastic liner in Vat 1 |
Vat 2 being shaped, see also next slide |
Vat 2 being shaped
|
Vat 3 being prepared, with crusher in background |
Grade Control Drilling, and Exploration |